Enterprise IVD Company - Ketryx

This is some text inside of a div block.

From Three Months to One Week: How a Top 5 IVD Company Transformed its Software Release Cycle

A leading worldwide in vitro diagnostics company develops software-driven diagnostic systems used across clinical and laboratory settings globally. At that scale, the ability to release fast without compromising regulatory standards is a business requirement. Every release touches patient workflows, and every delay has downstream consequences.

After implementing Ketryx, the company reduced its end-to-end release cycle from three months to just one week, reduced documentation time by 55%, and eliminated more than half of its existing tooling costs. Engineering and quality teams that once spent release cycles catching up on compliance now reinvest that capacity in advancing the product.

Impact

Three months to one week

End-to-end release cycles

70%

Reduction in documentation time

50% +

Reduction in tooling costs

Industry

IVD

Device Type

Diagnostics + SaMD

Tech Stack

Jira, GitHub

Pain Point: Engineering was not the bottleneck. Compliance was.

Code was routinely wrapped and ready to push well before the release window opened. The delay lived in compliance, but the problem wasn't processes or standards. It was the tooling and processes meant to manage it:

Solution: Quality built into existing workflows. No migration required.

Jira, GitHub, and other engineering tools were preserved. Ketryx overlaid the environment around them, embedding compliance infrastructure without requiring a platform migration.

Business Outcome: Their release cycle is 90% faster.

Get started building software in minutes, not months.