title: "I have versions of my product that I have already released and completed migration into Ketryx. How can I use them as a baseline for my Ketryx project?"
description: "Congratulations on completing your migration into Ketryx! There are a few ways that you can begin working on your first version of your project in Ketryx while using the design controls that you've migrated over."
category: "Frequently Asked Questions"
section: "Software Release Process"
keywords: ["baseline", "release controls", "migrated", "migration", "completed", "establish", "begin", "released"]
source_url: "https://support.ketryx.com/hc/en-us/articles/26003278319373-I-have-versions-of-my-product-that-I-have-already-released-and-completed-migration-into-Ketryx-How-can-I-use-them-as-a-baseline-for-my-Ketryx-project"
last_reviewed: 2026-06-11
---

# I have versions of my product that I have already released and completed migration into Ketryx. How can I use them as a baseline for my Ketryx project?

> **In short:** Congratulations on completing your migration into Ketryx! There are a few ways that you can begin working on your first version of your project in Ketryx while using the design controls that you've migrated over.

Congratulations on completing your migration into Ketryx! There are a few ways that you can begin working on your first version of your project in Ketryx while using the design controls that you've migrated over.

## Option 1: Begin working on your next project version

The first method is to simply create the next sequential [version](https://docs.ketryx.com/manuals/man-01-ketryx-lifecycle-management#id-6.4.3.-step-3.-create-and-associate-versions) in Ketryx that you'd like to release. You can treat the configuration items that have been migrated over into Ketryx as already existing. However, using this option, you would not be able to track what configuration items are _New_ or _Changed_ since all items would be new (at least to Ketryx).

## Option 2: Establish a baseline project by going through a simplified release.

If you'd like to see what items are _New_ or _Changed_ you can create a release in Ketryx that bypasses the release controls for the migrated information. Of course, you would re-enable the release controls for the next version that you are working on.

For instance, if you migrated version 1.0 configuration items to your new Ketryx project, you would first create version 1.0 in Ketryx. Next, you would need to perform the following:

1. Navigate to the project settings as the organization owner, disable the release controls for our project. ![](https://support.ketryx.com/hc/article_attachments/26003231109261)
2. (Optional) Navigate to the release version settings of the version that you'd like to establish as a baseline.
1. _Releases_
2. _Version "1.0"_
3. _Settings_
4. In the version settings you may want to describe the purpose of the baseline release in the Scope Description settings.
5. ![](https://support.ketryx.com/hc/article_attachments/26003307275533)
3. (Optional) You may also want to consider re-opening all items and performing a bulk change on these items to establish item ownership and designate the "Introduced in version" field as the baseline version.
4. [Release](https://docs.ketryx.com/manuals/man-02-software-release-process) your baseline version of Ketryx.
5. Re-enable the release controls for your project.
6. Create version "2.0" and begin working there.

## Option 3: Establish a baseline project by going through a mock release.

The third option includes creating a version of the project that you'd like to baseline using similar setup steps as Option 2. However, in this option, you would need to perform a full release using all the release controls of Ketryx.

## Related articles

- [What is a Fork Release in Ketryx and what can it be used for?](what-is-a-fork-release-in-ketryx-and-what-can-it-be-used-for.md)
- [How can I lock items for a release baseline?](how-can-i-lock-items-for-a-release-baseline.md)
- [Is the release version in Jira the same as the one in Ketryx?](is-the-release-version-in-jira-the-same-as-the-one-in-ketryx.md)
- [How can I lock multiple records at once?](how-can-i-lock-multiple-records-at-once.md)
- [When during the product lifecycle should change controls be implemented? Are they required for prototypes, version updates, or patch releases?](when-during-the-product-lifecycle-should-change-controls-be-implemented-are.md)