---
title: "What determines ‘full traceability’ in the release checklist?"
description: "The matrix can show 100% completion if all configured traceability checks are fulfilled, even if some items are present as dangling or unrelated, as long as they do not violate any enforced traceability rules - depending on configured checks."
category: "Frequently Asked Questions"
section: "Traceability"
keywords: ["release checklist", "determines", "checks", "traceability", "model", "configured", "trace", "module"]
source_url: "https://support.ketryx.com/hc/en-us/articles/38723354067341-What-determines-full-traceability-in-the-release-checklist"
last_reviewed: 2026-06-11
---

# What determines ‘full traceability’ in the release checklist?

> **In short:** The matrix can show 100% completion if all configured traceability checks are fulfilled, even if some items are present as dangling or unrelated, as long as they do not violate any enforced traceability rules - depending on configured checks.

The matrix can show 100% completion if all configured traceability checks are fulfilled, even if some items are present as dangling or unrelated, as long as they do not violate any enforced traceability rules - **depending on configured checks**.

If all default trace checks in the traceability module are 100%, the project will be viewed as having **full traceability.** While relationships are bidirectional in the data model, default traceability checks focus on **downstream enforcement** per [MAN-07](https://docs.ketryx.com/manuals/man-07-traceability) and the V-model.

Checks within your traceability module can be configured. For details, please see [trace configuration documentation here](https://docs.ketryx.com/reference/traceability-configuration).

## Related articles

- [Does Ketryx Support Multiple Traceability Matrices?](does-ketryx-support-multiple-traceability-matrices.md)
- [Why isn't the Traceability module in Ketryx showing a direct trace to items one-step removed?](why-isn-t-the-traceability-module-in-ketryx-showing-a-direct-trace-to-items-one.md)
- [Why does the “Documents approved” field in the release checklist show as completed when my generated documents are not approved?](why-does-the-documents-approved-field-in-the-release-checklist-show-as.md)
- [What types of automated documentation checks, including traceability, are available?](what-types-of-automated-documentation-checks-including-traceability-are.md)
- [Why are my tests showing up as 'AT' in the traceability module?](why-are-my-tests-showing-up-as-at-in-the-traceability-module.md)
